Hardwood and tile, Billings, since 2003
Hardwood that stays tight through a Montana winter.
Every delivery rests in your home for five days while we log its moisture. Then we install it, backed for 25 years.
- 4.9 from 386 Google reviews
- Free in-home measure
- Licensed and insured
Floors we install
The three floors we lay most, priced by the foot
Prices include the wood or tile, underlayment, trim and labor. Your written quote lands within 48 hours of the measure.

From $15.50 / sq ft
Herringbone and chevron
Hand-laid patterns for halls and entries. We dry-fit the first rows so you can approve the layout.
Most halls take 3 days

From $11.50 / sq ft
Wide-plank hardwood
Oak, hickory and maple in widths up to 10 inches, nailed or glued over a flattened subfloor.
Most rooms take 2 to 4 days

From $12 / sq ft
Tile floors and showers
Porcelain and stone set over a crack-isolation membrane, so a shifting slab can't snap a tile.
Most baths take 4 to 5 days
Spreading the cost? Floors over $3,000 qualify for 12 months with no interest, on approved credit.
Get a free estimate
| Day 1 | 11.8% |
| Day 3 | 9.4% |
| Day 5, ready | 7.9% |
Why we wait five days
Dry Montana air shrinks wood that wasn't ready
Most floor gaps aren't bad wood. They're wood installed too fast. Planks shipped from a humid mill lose moisture all winter here, and every board pulls away from the next.
- It rests in the room it goes inStacked on spacers with the furnace running, never in a garage.
- You get the log, signedReadings from the wood and the subfloor, so you know why we started when we did.
- 25 years on our workIf a board we laid cups or gaps from install error, we come back and fix it.
How it works
From measure to move‑in, about two weeks
Step 1
Free in-home measure
We laser-measure every room, check the subfloor for dips and moisture, and bring full-size boards and tiles to compare.
Quote in 48 hoursStep 2
The wood moves in
Your flooring arrives and rests in place. We stop by to take readings and you get a copy of every one.
At least 5 daysStep 3
Install and walk-through
Saws run outside, trim goes back on, and we walk the floor with you before the final bill.
Most homes in 2 to 4 daysReviews
What Billings neighbors notice a year later
"Not one gap"
"Our oak went in last January. It's now been through a full winter with the furnace roaring and there isn't a gap you could slide a card into."
"They fixed the floor under the floor"
"Erik found a low spot in our subfloor before tiling the bathroom and leveled it at no extra charge. Two other bids never even looked."
"Matched the quote to the dollar"
"Herringbone hallway done in three days. They cut everything in the driveway, so there was no dust in the house, and the bill matched the quote."
Questions
Before you book a measure
Something else? Call and Erik or Anna will pick up.
Do I really have to wait five days?
For solid hardwood, yes. Some loads are ready on day five, some need a week. Tile and engineered floors usually start sooner. We tell you the day based on the readings, not the calendar.
Do you move the furniture?
Yes. We move standard furniture out and back in at no charge. Pianos, safes and full china cabinets need a specialty mover, and we can recommend one.
Can you install over in-floor heat?
Yes, with engineered wood or tile. We test the system before and after, and keep it at a set temperature during the rest period.
How does financing work?
Projects over $3,000 can be paid over 12 months with no interest, on approved credit. Apply at the measure in about five minutes. No penalty for paying early.
How soon can you start?
Measures are usually booked within a week. Installs are scheduled two to three weeks out, plus the rest period for hardwood.
Sample room
Stand on it before you buy it
- MON to FRI8 am to 5 pm
- SATURDAY9 am to 1 pm
- EVENINGSMeasures by appointment
Full-size boards and tiles to walk on, on the West End. Or we bring a box of samples to your kitchen table.
Call (406) 555-0116