Pump and lift station controls
Duplex and triplex pump panels with level control, alarms and radio telemetry for towns and water districts.
Typical build9 working days
Control panels and PLC programming in Flagstaff, AZ
Custom panels and PLC programming for pump stations, sawmills and plant machinery. Every I/O point is tested on video before it ships.
What we build
Drawn, built, programmed and tested under one roof, so one team owns the result from the first sketch to the startup.
Duplex and triplex pump panels with level control, alarms and radio telemetry for towns and water districts.
Typical build9 working days
Motor control, drives and safety circuits for sawmills, bottling lines and packaging machines, built to your prints.
Typical build11 working days
New logic, retrofits of old controllers and operator screens your crew can read in a glance.
Typical retrofit2 weekend shifts
The bench test
Most startup delays start with a wire nobody tested. Our factory acceptance test finds it in Flagstaff, not at your plant.
Field results
0
overflows in three monsoon seasons
Fourteen lift stations for a northern Arizona water district, rebuilt with level backup and cellular alarms.
Municipal water district, 2022
6 min
planer changeover, down from 40
A new drive panel and recipe screen let one operator change board sizes without a maintenance call.
Sawmill, Coconino County, 2023
31%
fewer line stops in the first year
Retrofit of a 20-year-old relay panel to a PLC with clear fault screens on a canning line.
Regional brewery, 2024
Industries we build for
Our service techs take calls every night for panels we built, and for ones we did not.
(928) 555-0160 On site within 3 hours across Flagstaff, Williams and Winslow"I watched the test video on a Friday, saw every float switch and alarm work, and signed off from my truck. Monday the panel went in and the station was pumping before lunch."
4.9 average from 48 plant and utility reviews
How a project runs
Drawings, an old panel's photos or a one-page sequence of operation. A controls engineer calls you back within a day.
Day 1We draw the panel, list every part and send one fixed price. Nothing is ordered until you sign off.
Days 2 to 4We build it, run the bench test on video and ship it crated. Startup help on site is included within 150 miles.
About 11 working daysQuestions
Something else? Call and you will reach a controls engineer, not a sales line.
Yes. We are a third-party listed industrial control panel shop, and every panel gets a listing mark and a short-circuit current rating on the door.
Yes. Send your approved parts list and programming standard. We build to it and note any substitutions on the drawings before we order.
Workmanship is covered for 2 years. If a wire or termination we made fails, we fix it on site at no charge.
Often. Rush builds in 5 working days carry a 15% fee, and we will tell you on the first call if parts lead times make it impossible.
Weekdays 6 am to 5 pm. Service calls every night.
Founded by two electricians from the old mill on the east side of town. Now 34 people, still one building.