Box-build assembly
Enclosures, boards, wiring and fasteners brought together into a finished, tested unit.
- Torque-logged fasteners
- Functional test to your procedure
- Serial labels and build records
Now quoting new programs for spring. Quotes in 5 business days.
Contract manufacturing in El Paso since 2003
Build to print and box-build assembly, 25 to 5,000 units. One program lead, and a one-page status sheet every Friday.

What we build
We buy the parts on your bill of materials, or use the ones you send, then assemble, test, label and pack to your spec.
Enclosures, boards, wiring and fasteners brought together into a finished, tested unit.
Cut, strip, crimp and lace to your drawing, from 2-wire leads to 80-circuit harnesses.
Parts counted, bagged and boxed by job, or finished goods packed for retail and field.
Stage 01
A complete package is the fastest way to an accurate price. Missing a piece? Send what you have and we will list the gaps in writing.
Stage 02
Your quote shows price per unit at three quantities, the parts with long lead times, and every question we have about the print. We review it with you on a 30-minute call.
Stage 03
We build the first units slowly, photograph each step and measure every callout on the print. Production waits until you sign off.
Stage 04
Your program lead runs the build, chases parts and posts the Friday sheet. Engineering changes go in at a unit number you approve, never mid-shift.
Stage 05
Finished units ship to your dock on either side of the border, or wait in our stockroom for timed releases. Reorders reuse the same instructions and the same people.
Change applied from unit 861: new gasket, Rev C. Signed, Ana R., program lead.
The Friday sheet
No portal to log into and no status calls to schedule. By 3 p.m. Mountain time each Friday, your program lead sends a single page you can forward to your boss.
★★★★★
Every Friday at 3 I get one page: units built, yield, what is short and when it lands. I have not chased a status update in two years.
They caught a connector on our BOM that did not match the harness drawing. During the quote, not on the line. That saved us a full rework lot.
Our first article came with a 42-point report and a photo of every build step. We approved it in one meeting and shipped 400 units that month.
Before you send files
25 units. Smaller than that, a prototype shop is usually a better fit, and we are happy to point you to one.
Either. We can buy every line on your bill of materials, build from parts you consign, or mix the two. Your quote shows which is which.
Send the change in writing. We agree on the unit number where it starts, update the instructions and note it on the Friday sheet.
Usually three weeks after the last part arrives. Long-lead parts are flagged in your quote so there are no surprises.
Yes. We ship to docks on both sides of the border and can hold finished goods in our stockroom for scheduled releases.
Yes. We are ITAR registered, sign your NDA before files move, and keep controlled drawings on a restricted drive.
Start a program
Prices at three quantities, long-lead parts flagged and every open question listed. No commitment.
Rather talk first?
(915) 555-0136