Custom injection molding in Durham since 1994

Design plastic parts that mold right the first time.

Read our free design guide, then send your CAD. In 3 business days we mark up draft, walls and gates at no charge.

  • ISO 9001 registered
  • Molds built in our own toolroom
  • Quotes in 3 business days
Process technician in safety glasses checking a freshly molded gray housing beside an open injection mold

Freemoldability markup in 3 days

01 Design rules

Anatomy of a part that molds clean

These six numbers prevent most sink marks, warping and stuck parts. Our free markup checks every one on your model.

1Draft every wall

Angle the sides so the part slides off the core.

1 to 2 degrees, 3 if textured

2Keep walls even

Uneven walls cool unevenly, and that is where warp starts.

1.5 to 3 mm, within 15%

3Thin your ribs

Thick ribs leave sink marks on the show side.

50 to 60% of the wall
Molded off-white plastic enclosure half showing even walls, a grid of ribs, screw bosses and a snap clip

4Core out bosses

Hollow screw bosses and tie them to a wall with gussets.

Boss wall 60% of nominal

5Round inside corners

Sharp corners trap stress and crack at the first drop.

Inside radius 0.5x the wall

6Plan snaps and undercuts

Every undercut needs a slide or lifter, and each one adds cost.

Ask before you add one

02 Resin picker

Six resins cover nine parts out of ten

Start with what the part has to survive: heat, impact, chemicals or a snap that flexes a thousand times. Then pick the cheapest resin that clears the bar. We stock all six in natural and black, and match colors in house.

Quick picker: the part has to...

  • Flex a thousand timesPP
  • Look sharp paintedABS
  • Be clear and toughPC
  • Slide or meshAcetal
  • Live near heatGF nylon
  • Feel soft in the handTPE
$ Lowest cost

Polypropylene (PP)

Living hinges, caps and chemical-resistant housings. Flexes all day without cracking.

Shrink
1.0 to 2.5%
Good for
Hinges, lids, bins
$$ Low cost

ABS

Stiff, tough and easy to paint or plate. The default for consumer enclosures.

Shrink
0.4 to 0.7%
Good for
Housings, bezels, knobs
$$$ Mid cost

Polycarbonate (PC)

Clear, very impact resistant and good to about 250°F. Lab and medical favorite.

Shrink
0.5 to 0.7%
Good for
Lenses, guards, instrument cases
$$$ Mid cost

Acetal (POM)

Slippery and dimensionally steady. Gears, latches and anything that slides.

Shrink
1.8 to 2.2%
Good for
Gears, bushings, clips
$$$ Mid cost

Glass-filled nylon

Strong and stiff near metal parts and engine heat. Plan for a rougher surface.

Shrink
0.3 to 0.8%
Good for
Brackets, mounts, fan parts
$$ Low cost

TPE overmold

A soft-touch grip or seal molded right onto a rigid part. No glue, no second assembly.

Hardness
30 to 90 Shore A
Good for
Grips, gaskets, bumpers

03 Tooling costs

What a mold costs, before you ask

Typical ranges for a palm-sized part. Your markup comes with an exact price for the tool and for each part, at your yearly volume.

Prototype aluminum

from$4,800

  • First parts in 3 weeks
  • Good to about 25,000 parts
  • Best for pilots and launches
Most programs

Production steel, 1 cavity

from$14,500

  • First parts in 5 weeks
  • Good to 500,000 parts and up
  • Free storage and upkeep here

Production steel, 4 cavity

from$28,000

  • First parts in 7 weeks
  • Good to a million parts and up
  • Lowest price per part

The math that surprises people: at 50,000 parts a year, a 4-cavity tool often costs twice as much up front and cuts the part price by 60%. Your quote shows both, side by side. You own the mold once it is paid.

22 pressesFrom 55 to 400 tons, running 24 hours, 5 days a week
±0.002 in.Held on critical features, checked on our CMM
0.1 g to 2.5 lbShot range, parts up to 24 inches long
Since 1994Family owned, molding in Durham for 32 years

Industries we mold for:

Medical devicesLab instrumentsConsumer electronicsAgtechHVAC componentsOutdoor gear

How a new part starts

From your CAD to approved parts in three steps

1

Send your CAD

A STEP file, your yearly volume and the resin if you know it. Need an NDA first? We sign yours before you upload.

Takes 5 minutes
2

Get the markup and quote

Draft, wall, gate and ejector notes marked right on your model, with the tool price and the part price.

Back in 3 business days
3

Approve first parts

First-shot samples arrive with a dimensional report. You sign off, and production starts on your schedule.

3 to 7 weeks after go
Request a quote

Or call (919) 555-0128 and ask for an engineer.

From the engineers we work with

Caught in CAD, not in steel

Their markup flagged a wall that jumped from 2 mm to 4 mm next to our battery boss. Fixing it in CAD took an afternoon. Fixing it in steel would have cost us six weeks.
Marcus T.Mechanical engineer, Research Triangle Park
They talked us out of a pricey blend and into plain polycarbonate. The cracking at our screw bosses stopped, and each part got 31 cents cheaper.
Dana R.Product lead, Morrisville
First parts showed up on day 26 with a full dimensional report. Two small tweaks, and we approved production the next week.
Luis M.Purchasing manager, North Raleigh

Answers

Questions buyers ask first

Straight answers on minimums, ownership and timing. If yours is not here, an engineer picks up the phone.

Talk to an engineer

Weekdays 7 a.m. to 6 p.m. Eastern. No sales script.

Call (919) 555-0128
What is the smallest order you run?

Production runs start at 1,000 parts. For launches we run bridge lots of 250 off an aluminum tool, so you can sell before the steel tool is done.

Who owns the mold?

You do, once it is paid. We store and maintain it at no charge while it runs here, and we ship it to you within two weeks if you ever move the work.

Should I start with aluminum or steel?

Aluminum if you expect design changes or need parts fast. Steel once the design is frozen and volume passes about 25,000 parts. Many programs do both.

Can you mold over metal inserts or add a soft grip?

Yes. We insert-mold threaded brass inserts and pins, and overmold soft TPE grips and seals onto rigid parts in a second shot.

Do you sign NDAs?

Yes, before you send a single file. Send yours, or we can send our one-page mutual NDA.

What files should I send?

A STEP file or your native CAD, a drawing with critical dimensions if you have one, the yearly volume and any color or finish you need.

Free moldability markup

Send your CAD. See the markup in 3 days.

Every quote comes with notes on your model, a tool price and a part price. No obligation, and your files stay under NDA.

  • Draft, wall and gate notes on your model
  • Aluminum and steel prices side by side
  • A named engineer you can call
(919) 555-0128

Request a quote

Markup and quote back in 3 business days.
Call Request a quote