Structural steel and welding · Dayton, Ohio

Drawn in five days. Raised by our own crew.

Mezzanines, platforms and stairs for Miami Valley plants. Every critical weld is ultrasonic-tested before we sign off.

  • 4.9 from 86 plant reviews
  • AWS-certified welders
  • Since 1989
Zelenka ironworkers on a lift bolting a steel beam into a new warehouse mezzanine
5 daysfrom site measure to shop drawings
100%of critical welds ultrasonic-tested
640+platforms, mezzanines and stairs set
2,100days without a lost-time injury

What we build

Steel for plants that can't stop running

We measure, draw, fabricate and erect in house. One crew, one schedule, and installs planned around your shifts and shutdowns.

Mezzanines

Add storage or office space above your floor without moving walls. Rated for pallet loads.

Up to 250 lb per sq ft

Platforms and catwalks

Safe access to tanks, presses and conveyors, with toe boards and gates done right.

Built to OSHA rules

Stairs, ladders and rails

Egress stairs, ship ladders and guardrail that pass inspection the first time.

Installed in 1 to 2 days

Weld repair and beam work

Cracked welds, damaged columns and new openings, reinforced on site with hot-work safety.

Same-week crew visits

Our work

Recent jobs around the Miami Valley

Finished two-level steel mezzanine with stair and guardrail in a distribution warehouse
Parts mezzanine, Vandalia4,800 sq ft, set over two weekends
Technician testing a beam weld with an ultrasonic probe
Ultrasonic weld testingEvery critical joint, logged by location
Veteran welder with his helmet raised checking a fresh weld where a platform beam meets a column
Press line platform, MoraineMoment connections welded in place
Steel equipment platform with stair and safety gate beside production machinery in a plant
Equipment platform, SpringfieldAccess to two mixers, built and set during a planned 4-day shutdown

See your project here?

Send a photo of the space and a rough size. We will come measure within 48 hours.

Request a quote

Typical prices

Know the range before we visit

Installed prices for Dayton-area plants, including drawings, steel, paint and our crew.

Stairs and rails

from

$6,500

  • Egress stair up to 12 ft rise
  • Guardrail and toe boards
  • Installed in 1 to 2 days
Request a quote

Equipment platforms

from

$14,000

  • Platform up to 200 sq ft
  • Stair or ship ladder access
  • Self-closing safety gate
Request a quote

Mezzanines

from

$42/sq ft

  • Engineered for your loads
  • Deck, stairs and rail included
  • Weekend or shutdown installs
Request a quote

Final price comes after a free site measure. Permit drawings sealed by a licensed engineer are included on mezzanines.

How a job runs

Measure, draw, raise

01

Site measure in 48 hours

A project lead walks your floor, laser-scans the space and asks about forklifts, loads and shift times.

02

Shop drawings in 5 days

Detailed drawings and a fixed price land in five working days. Nothing is cut until you sign off.

03

Our crew sets it

Our own ironworkers erect it, often on a weekend. Critical welds are ultrasonic-tested and the report is yours.

4.9 from 86 reviews

Plant managers say it best

★★★★★
"They set a 4,800 sq ft mezzanine over two weekends. Monday morning our pickers were working under it like it had always been there."
Denise R.Operations manager, Vandalia
★★★★★
"A cracked column base on our press line. Their crew was here in three days, welded it on a Saturday and handed us the UT report before they left."
Tom W.Maintenance lead, Moraine
★★★★★
"The shop drawings came back on day five, like they said. Our safety team signed off on the platform gate without a single change."
Anjali S.Facilities engineer, Kettering

Questions

Before you call

Can you work while our plant is running?

Yes. We fence off the work zone, pull hot-work permits with your safety team and keep a fire watch on every weld. Most heavy lifts happen on weekends or planned shutdowns.

Do you handle engineering and permits?

For mezzanines, yes. A licensed structural engineer seals the drawings and we file for the permit. For stairs and platforms we include the load calculations.

Why ultrasonic testing?

A weld can look perfect and still hide a void inside. Ultrasonic testing finds it before your building inspector or your forklift does. You get a report showing every tested joint.

How far do you travel?

Our crews work within about 90 miles of Dayton, including Springfield, Cincinnati and Columbus.

Free site measure

Request a quote

Tell us what you need and a project lead will call to set up a site measure within 48 hours.

Or call a project lead at (937) 555-0120

Call Request a quote