West Fork cabin
Filmed January 14, 2026, 11 inches on the ground- Road
- 2.4 miles of gravel off the highway. County plows the first 2.1 miles by 9 am after a storm.
- Last stretch
- 0.3 miles of private road. The road association plows it for $420 a winter.
- Steepest grade
- About 9% near the creek crossing. All-wheel drive and snow tires, December to March.
- Utilities
- Year-round power. Well with heat tape. Propane delivered every six weeks in winter.
- Signal
- Two bars at the cabin. Wired internet available at the road.
Includes a 6-minute film of the drive from the highway to the front door.