A new brick and glass middle school at dusk, its two-story learning commons glowing behind a wide plaza

Commercial architects in Huntsville since 1994

Renovations planned so your building never has to close.

Schools, engineering offices and mixed use in North Alabama. 22 school renovations, every one open on the first day of class.

  • Open on day one: 22 of 22 schools
  • Licensed in Alabama and Tennessee

Ridgecrest Middle SchoolNew learning commons and 14 classrooms, built over two summers while students used the rest of the building. 2025.

32years designing buildings across North Alabama
22 of 22school renovations open on the first day of class
140+offices, schools and mixed-use buildings completed
0days an occupied client building had to fully close

Sectors

Three kinds of buildings, all of them in use while we work

See recent projects
A bright renovated school learning commons with wood ceilings, tall windows and flexible tables

01 · SCHOOLS

K-12 renovations and additions, phased around the school calendar

We plan the work in summer blocks and weekend shifts, and walk the building with your principal before every phase.

Schools
38 projects
Largest
186,000 sq ft
An open engineering office with long shared worktables, glass meeting rooms and daylight from high windows

02 · OFFICES

Workplaces for engineering and research teams

Lab-ready floors, quiet rooms for focused work and secure areas planned in from day one, often while your staff keep working on the next floor.

Offices
61 projects
Typical
20,000 to 90,000 sq ft
A brick mixed-use building with shops at street level and apartments above on a tree-lined downtown street

03 · MIXED USE

Shops below, homes above, on streets people already love

Infill buildings that fit the block, with storefronts sized for local businesses and apartments that stay quiet.

Mixed use
24 projects
Homes added
610

Recent projects

What we built, and how each building stayed open

Ridgecrest Middle School

School renovation64,000 sq ft2025

Two summers. Classrooms swapped wing by wing, never more than 6 at a time.

Whitlow Engineering offices

Office interior48,000 sq ft2024

Floor by floor. 220 engineers moved once, over one weekend.

Mill Street Commons

Mixed use92,000 sq ft2024

New build. 11 storefronts and 84 apartments on a former parking lot.

Oak Hollow Elementary

School addition22,000 sq ft2023

Fenced site, separate entry. Crews never crossed the student drop-off.

Lakeside Research Center

Office and lab71,000 sq ft2022

Night shifts. Noisy work ran 7 pm to 5 am so labs kept running by day.

Phasing

How a school gets rebuilt without missing a day

The plan for keeping your building open is drawn before the building is. Everyone sees it on one page.

  • A phase calendar in the first meetingBuilt from your school year or lease dates, not from a builder's preference.
  • Separate paths for people and crewsFenced work zones, their own entries and clean air barriers at every opening.
  • A weekly walk with your teamWe check the work and the plan every week until the last phase closes out.

Sample phase calendarRidgecrest Middle School

JunJulAugSchool yearNext Jun Learning commons East classrooms Weekend work West classrooms

ConstructionQuiet weekend workRooms in use by students

How we work

Four steps from first meeting to ribbon cutting

01

Listening sessions

We meet the people who will use the building, from teachers and engineers to custodians, and write down what they need.

02

Concept and cost

Two or three options with a cost estimate and a phase calendar, so your board can choose with real numbers.

03

Drawings and permits

Full construction drawings, code review and permits, with bid help if your project is publicly funded.

04

On site every week

We answer contractor questions within two business days and walk the site with your team until move-in.

A fixed-fee proposal within 10 business days of our first meeting. It lists every phase, every deliverable and the people who will do the work.

Start a project
Three architects in plain hard hats walking an empty school hallway during a summer renovation, reviewing drawings

The firm

The principals who start your project finish it

Grace Halden

Founding principal · licensed architect, 34 years

Leads our school work. Has planned summer phasing for 22 renovations without a late opening.

James Pruitt

Principal · licensed architect, 27 years

Leads offices and research buildings, including secure work areas for engineering firms.

Danielle Mercer

Principal · licensed architect and certified planner, 18 years

Leads mixed use and infill, from zoning meetings to storefront details.

Clients

What owners say once the doors open

"Two summers, 14 new classrooms and a new commons. Our students walked in on the first day of school both years and never saw a hard hat."
Dr. Angela W.Principal, Ridgecrest Middle School
"They rebuilt three floors around 220 engineers. We lost one Friday afternoon to the move, and the phasing calendar on page one never slipped."
Marcus T.Facilities director, engineering firm
"Danielle got our mixed-use plan through two neighborhood meetings with the block on our side. The storefronts leased before the apartments were done."
Rebecca L.Developer, Mill Street Commons

Questions

Before your first meeting

Bring your questions. The first meeting is free and usually takes about an hour.

Can you really keep our building open?

In 32 years we have never had to fully close an occupied client building. It takes a phase plan drawn early, and a contractor who agrees to it before they bid.

Do you work on publicly funded projects?

Yes. About half our work is for school districts and public agencies. We prepare bid documents and attend board meetings when you need us.

How is your fee set?

We send a fixed-fee proposal within 10 business days of the first meeting, broken out by phase. Changes in scope are priced in writing before any extra work starts.

How far do you travel?

Most of our projects are within 90 minutes of Huntsville, across North Alabama and southern Tennessee.

Start a project

Tell us about your building and your deadline

A principal will call you within one business day to set up the first meeting.

  • First meeting free, no obligation
  • Fixed-fee proposal in 10 business days
  • Or call (256) 555-0118
A principal replies within one business day.
Call Start a project